The studio walls have reached ring beam level!
The ring beam is made of a mixture of concrete and cement. It holds the building together, and it sets the foundation for the roof. When the ring beam is done, roof construction can begin!
The studio walls have reached ring beam level!
The ring beam is made of a mixture of concrete and cement. It holds the building together, and it sets the foundation for the roof. When the ring beam is done, roof construction can begin!
We would love to hear from you. Drop us a line!
Plot 212 Sonko Close, Kabalagala
(Behind Equity Bank),
Kampala, Uganda
+256 770 509 215 (UG)
+256 701 935 813 (UG)